9321 Port Sheldon St. Zeeland, MI 49464

Allendale Main Floor Remodel

Project Location:

Allendale, MI

BUDGET:

$150k

Project Completed:

2025

main floor remodel in Allendale, MI

About Project

This project involved a significant home remodel on the main floor and basement bathroom. The scope of work includes:
• Gut and remodel the primary bathroom
• Remodel the lower level
• Replace the existing basement stair railing with white oak newels / top rail and black iron pipe guardrails
• Install a new wine bar area in the kitchen
• Construct a maple post and apron support system for an extended kitchen island countertop
• Remodel the kitchen and extend the island
• Remove all floor coverings on the main level and stair landing and replace with laminate flooring
• Paint all existing base molding and new shoe molding everywhere that the new laminate and tile floors have been installed
• Paint all walls on the main and lower level
• Stain the stair railing system, floating shelves, and front door

LET’S TALK!

Curious to learn more about our process or ready to dive into discussing
your upcoming home remodeling project? Simply fill out the form below or
give us a call at 616-566-7715.

Contact Us

Testimonials

What Our Customers Say